Today, on November 4, we attended the public deliberation of the scoping report of “Rustavi Azot” JSC at the Rustavi City Hall.
The meeting was also attended by representatives of the company, the consulting company, the ministry, and the Rustavi City Hall.
“Rustavi Azot” plans to change the operating conditions of the chemical plant. The planned project, along with other changes including capacity increase and re-equipping, envisages the launch of a new product – urea (500,000 tons/year) production.
The new management company “Indorama” plans to implement a modernization project, which includes the implementation of a 206,250 tons per year low-density ammonium nitrate production line project.
In the scoping report the following changes envisaged by the modernization project is discussed:
– Construction of a 500,000 t/year urea (carbamide) workshop;
– Reconstruction of the N2 ammonia workshop with a capacity of 258.75 t/year;
– Installation of a 5,000 t capacity ammonia storage tank;
– Installation of a 2.03 MW installed capacity steam turbine at the ammonia synthesis workshop;
– Construction of a wastewater treatment/recovery facility for industrial wastewater generated during the operation of the chemical plant;
– Construction of a wastewater treatment facility for urban wastewater generated during the operation of the chemical plant;
– Construction of a 20 MW solar power plant (generating 32.330 GWh/year of electrical energy);
– Modernization/re-equipment of the sodium cyanide workshop and increase of capacity by 20,000 t/year.
According to the modernization project, the installation of a system for reducing nitrogen oxides emissions into the atmosphere is envisaged.
We share the questions/comments voiced by us at the public deliberation:
– The introduction of a high-efficiency dust collection system by the company is commendable, but it would be desirable to provide more details in the document on how these parameters are planned to be achieved and specifically which pollutants will be cleaned.
According to the representative of the consulting company, these details (what volume will be in the scrubber and what volume will come out) will be provided in the EIA.
– Continuous monitoring system: Only general information is presented that the project envisages the installation of a system for reducing emissions of nitric acid, N2O and NOx, and a continuous monitoring system in the nitric acid workshop; it is important that the EIA provides more details about this equipment. Also, is having a self-monitoring system mandatory only for this one shop?
As the company representatives explained, as of today, this system is installed on 7 units and in the future it will be installed on all units to which it belongs.
– CO2 emissions and energy efficiency: Despite the fact that reducing CO2 emissions is a positive aspect, the document only mentions the general benefits and that it will be possible to reduce CO2 emissions by approximately 2,703 tons per year. More detailed explanation is desirable, what are the percentage reduction indicators of energy-efficient technologies and their impact on the company’s total emissions.
– Collection and storage of hazardous waste: The information on the temporary storage and further disposal of waste is of a general nature. The lack of a disposal strategy poses pollution risks, especially with chemical waste containing hazardous substances. The EIA report is recommended to have a precise plan for waste collection and transportation that will comply with safety standards.
We also focused attention on the treatment of industrial wastewater and the water generated as a result of wagon washing, which is toxic and cannot be spilled on the ground.
The representative explained that it is planned to install 2 treatment facilities – one for industrial wastewater and the other for domestic wastewater, and the sewerage system will be connected to this treatment plant, the washing water of the wagons will also be collected in the treatment plant.
– The scoping report mentions the installation of a 20 MW solar power plant. What percentage will solar energy occupy in the company’s total energy consumption? Also, how will the management of the waste (the panels themselves that are retired from operation) generated as a result of the operation of this station be carried out?
– We were also interested in whether and how the rapid response system works.
The company’s staff explained that sensors will be installed and in case of increase in concentration, they will be turned on immediately. Now these systems are in 2 workshops, and according to the company’s representatives, it is planned to be installed in other workshops as well.
– We also asked about the reasons for the recorded exceedances from the self-monitoring system, which, based on the inspection materials sent by the ministry, were also recorded on specific days in other months during the period from January to March.
The company representatives said that such facts are recorded when there are certain technological violations and they admit that a properly functioning situation is not yet in place in the plant, but they will improve the situation over time.
We would like to note the fact that after the public deliberation, for the first time, visitors were not allowed to visit the plant’s territory and we were told that for this it is necessary to obtain a permit one day in advance, which was explained from the point of view of safety measures.
We would like to remind you that after each public deliberation, representatives of the ministry visit the production site and get acquainted with the planned changes. Together with them, we have toured the territory of many enterprises.